Two contractors visit a commercial building to price the exact same rooftop air conditioner. One bid includes a sheet-metal transition and a return visit from the controls contractor. The other has a single line for equipment changeout. Before an owner can compare the totals fairly, someone needs to follow the job from the delivery truck to the thermostat downstairs.
The Curb and the Duct Openings
A packaged rooftop unit sits on a raised base known as a curb. The proposed new unit may cover roughly the same patch of roof, but its air openings may not line up with the existing ducts below. A contractor who plans for an adapter or a new duct transition is pricing a specific piece of necessary work. A shorter bid may simply assume that the old arrangement can be reused. Ask what each contractor observed during the first site visit.
Request a simple sketch of the existing curb, the new unit, and the supply and return openings. A dated photo helps the owner and the sheet-metal shop identify the exact roof opening under discussion. Reviewing existing supports and connections before the order is locked in leaves time to change the plan if the openings do not match.
What “Delivery Included” Actually Covers
The phrase “delivery included” can mean a truck arriving at the property, or it can mean crane hoisting and debris removal. Both bidders should state where the supplier hands over the equipment, who arranges the lift if one is required, and who takes the old unit away. If a roofing contractor needs to access the site after the lift, that visit should have its own line in the schedule. Watch for hidden allowances: if a lift price assumes a very specific delivery window, ask how the price changes if the building can only accept the unit earlier in the day. A short call from the superintendent can settle logistics before either bidder commits to a firm date.
Controls, Start-Up, and Comparing the Same Scope
On the first morning after installation, someone must check that the rooftop unit responds to the thermostat serving each suite and restore the weekday schedule if the controls were changed. Ask for a named contact for those tasks, especially when the building uses a separate controls vendor. Keep start-up and handover details beside the equipment price on a comparison sheet. One contractor may include a follow-up with the building engineer; another may expect the owner to coordinate that step.
A property manager can send every bidder the same marked roof plan and the building’s delivery hours, and ask each one to mark included work, exclusions, and items still waiting on a final site measurement. Once every bidder has priced the same lift, metalwork, and controls work, the difference between the totals is much easier to evaluate.